TM 11-5805-239-35
CHAPTER 4
GENERAL SUPPORT TESTING PROCEDURES
b. Comply with the instructions preceding
4-1. General Support Testing
each chart before proceeding to the chart. Per-
Procedures
form each step in sequence. Do not vary the
sequence. For each step, perform all the act-
ions required in the Control settings c o l u m n s ;
a. Testing procedures are prepared for use
then perform each specific test procedure and
by Signal Field Maintenance Shops and Signal
verify it against its performance standard.
Service organizations responsible for general
support maintenance to determine the accept-
4-2. Test Equipment and Other
ability of repaired electronic equipment. These
Equipment
procedures set forth specific requirements that
All test equipment, tools, and materials re-
repaired electronic equipment must meet be-
quired to perform the testing procedures given
fore it is returned to the using organization.
in this chapter are listed in the charts below.
The testing procedures may also be used as a
These are authorized under TA 11-17 and
g u i d e to test equipment repaired by direct
TA 11-100 (11-17), or TOE 11-158D and
support personnel if the proper tools and test
TA 11101 (11-158), or are repair part items
equipment
are
available.
A
summary
of
the
of the subject equipment authorized for stock-
age at general support.
a. Test Equipment.
Nomenclature
Federal stock No.
Technical manual
6625-229-1045
Test Set I-199(*)a
TM 11-2604.
TS-352(*)Ub
TM 11-5527.
6625-242-5023
(2 EA).
P o w e r CN-16(*)/U c.
59502332086
None.
Electric Light Assembly
TM 11-5540.
6695-537-4470
MX-1292/PAQ.
a Indicates Test Set 1-199 or I-199-A.
b Indicates Multimeter TS 352/U, TS-352A/U or TS 352B/U.
c Indicates Transformer, Variable Power, CN 16/U or CN-16A/U.
b. Other Equipmmt.
Nomenclature
Federal stock NO
Technical manual
Test Lead Set CX-133lA/U------
6625-395-9313
None.
4-1