TM 55-1730-229-34
AG 320A0-MME-000
TO 35C2-3-473-2
TM 1730-34/1
aj. Slide rain shield (29) bolts
(1) Position front panel (33) on
(30) down into slots in top of front
front of module with wires directed to-
panel (33). Tighten nuts (31).
ward terminal boards on panel (39).
ak. Observe tags installed during
(2) Install and tighten two bolts
disassembly and connect wires from front
(47) below blue fill controls (50) on
fill manifold (51).
panel (33) to terminal boards on panel
(39) .
(3) Install and tighten two bolts
al. Route wires from temperature
(34) through top of front panel (33) and
sensors (79) along wiring harness to
into brackets (35) at top of reservoir.
terminal boards on panel (39).
(4) Put RESERVOIR select
valve
am. Observe tags installed during
handle (49) over valve shaft.
disassembly and connect temperature sen-
sor wires to terminal boards on panel
(5) Insert setscrew (48) in RESER-
VOIR select valve handle (49).
(39).
an. Route wires from filter head as-
(6) Install dust caps (that have
semblies (22, 27) along wiring harness
chains (52) rivited to front panel (33)
to terminal boards on panel (39).
on SYSTEM FILL, SYSTEM DRAIN, HIGH PRES-
SURE, and RETURN connectors.
ao. Observe tags installed during
(7) Install new copper seal (7C-4)
disassembly and connect filter assembly
pressure sensor wires to terminal boards
on elbow (9) on back of pressure gauge
(8).
on panel (39).
(8) Install free end of tube as-
ap. Route wires from load valve so-
lenoid (66) along wiring harness to ter-
minal boards on panel (39).
(8). Tighten hand tight.
aq. Observe tags installed during
disassembly and connect load valve sole-
noid wires to terminal boards on panel
(9) Torque both ends of tube as-
(39).
and 150 inch-pounds.
ar. Install wire ties where needed
to hold wiring harness together.
ai. Install vent dryer (17, figure
Install module top.
as.
at. Fill module with hydraulic fluid
(1) Slide vent dryer (17) into
dryer retaining clamp at front of mod-
1730-229-12.
ule.
au. If required, charge accumulator
(2) Install a new copper seal (7C-
8) on fitting on top of vent dryer.
as follows:
(1) Connect a short pneumatic line
(3) Install free end of tube as-
the supply shutoff valve
between
fitting. Torque to between 450 and 500
inch-pounds.
and one end of a tee connector.
8-45