GENERAL SUPPORT TESTING PROCEDURES
quired to perform the testing procedures given
in this section are listed in the following chart
a. Testing procedures are prepared for use
and are authorized under TA 11-17, Signal
by Signal Field Maintenance Shops and Signal
Field Maintenance Shops, and TA 11-100(11-
Service Organizations responsible for general
17), Allowances of Signal Corps Expendable
support maintenance of electronic equipment
Supplies for Signal Field Maintenance Shop,
to determine the acceptability of repaired
Continental United States.
equipment These procedures set forth specif-
a. Test Equipment.
ic requirements that repaired equipment must
meet before it is returned to the using organi-
zation. These procedures may also be used as
a guide for testing equipment that has been
repaired at the direct support level if the prop-
er tools and test equipment are available. A
b. Other Equipment.
summary of the performance standards is giv-
(1) Switch, toggle, SPST.
(2) Battery, 45-volt.
(3) Resistor, 1,000-ohm.
b. Comply with the instructions preceding
(4) Resistor, 1,500-ohm.
each chart before proceeding to the chart. Per-
(5) Potentiometer, 5,000-ohm.
form each step in sequence. Do not vary the
(6) Resistor, 200-ohm.
sequence. For each step, perform all the ac-
tions required in the Control settings columns;
4-3. Physical Tests
and Inspections
then perform each specific test procedure and
a. Test Equipment and Materials. None re-
verify it against its performance standard.
quired.
b. Test Connections and Conditions. No con-
4-2. Test
Equipment and Other Materials
nections necessary.
All test equipment and other equipment re-
c. Procedure.
.