TM 11-6130-266-15
CHAPTER 8
SHIPMENT, LIMITED STORAGE, AND DEMOLITION
TO PREVENT ENEMY USE
a. Smash. Smash the cabinet, meters, and
controls. Use sledges, axes, hammers, crowbars, and
8-1. Packaging for Shipment
other heavy tool available. Remove the top panel, and
smash the internal components.
The exact procedure for packaging the equipment for
shipment and storage depends on materials available
b. Cut. Cut the wiring of the PP-6224/U. Use
and conditions under which the equipment is to be
axes, handaxes, or machetes.
shipped or stored. If the original packaging materials are
available, package the equipment as shown in figure
WARNING
2-1. If
the original packaging materials are not available,
use sturdy cartons and barrier material to protect the
equipment.
and incendiary devices. Use these
items only when the need is urgent.
8-2. Authority for Demolition
c. Burn. Burn the technical manuals first. Burn as
Demolition of the equipment will be accomplished only
much of the equipment as is flammable; use gasoline,
upon order of the commander. The destruction
oil, flamethrowers, and similar materials. Pour gasoline
on the cut cables and internal wiring and ignite them.
prevent further use of the equipment.
Use a flamethrower to burn the spare parts, or pour
gasoline on spares and ignite them. Use incendiary
8-3. Methods of Demolition
grenades to complete the destruction of the unit.
Use any of the methods of destruction given below. The
d. Dispose. Bury or scatter destroyed parts, or
time available for destruction is the major factor in
throw them into nearby waterways.
determining the method of destruction.
Figure 8-1. Color code marking for resistors and
capacitors.
(Located in back of manual.)
Figure 8-2. Power Supply PP-6624/U, block diagram
(Located in back of manual.)
Figure 8-3. Power Supply PP-6624/U, schematic diagram.
(Located in back of manual.)
8-1