TM 32-5811-018-14&P
SERVICE UPON RECEIPT AND INSTALLATION
Section I.
SERVICE UPON RECEIPT OF MATERIAL
Unpacking.
When packed for shipment, the power supplies and power supply test
set are wrapped with plastic and placed in a cardboard container.
Fiberboard blocking material is provided to minimize shock during
The procedure for unpacking the units is obvious upon
transport.
inspection.
Checking Unpacked Equipment.
Inspect the equipment for damage incurred during shipment. If
a.
the equipment has been damaged, report the damage on SF Form 364,
Report of Discrepancy (ROD), as prescribed in AR 735-11-2 and AR
735-12-12.
b. Check the equipment against the component listing in the
packing slip to see if the shipment is complete. The equipment
should be placed in service even though a minor assembly or part that
does not affect proper functioning is missing.
c. Check to see whether the equipment has been modified.
(Equipment) that has been modified will have the MWO number on the
front panel, near the nomenclature plate.)
Check also to see whether
(Current MWOs
all currently applicable MWOs have been applied.
applicable to the equipment are listed in DA PAM 310-4).
d. For dimensions, weights, and volume of packaged items, see SB
700-20.
e. After unpacking and before installation, test the power
supplies by following the procedures in chapter 6, section V.
Section II.
INSTALLATION INSTRUCTIONS
Tools, Test Equipment, and Materials Required for Installation.
No tools, test equipment, or materials are required for
installation of the power supplies or the power supply test set.
Installation Instructions.
The power supplies and power supply test set are portable units
requiring no installation.