TM 55-1730-229-12
TO 35C2-3-473-1
(a)
Verify reservoir level is at the to HIGH
level.
(b)
Close RETURN BLEED valve (item 1,
Inspect and remove all foreign matter from quick
disconnects, before connecting hose to AGPU
and dual manifold block.
(c)
Close HIGH PRESSURE BLEED valve
(e)
Close BYPASS/FLUSH valve (item 5,
(d)
Close RESERVOIR DRAIN VALVE
on dual manifold.
WARNING
(e)
Close SYSTEM DRAIN valve (item 4,
(f)
Close GAUGE SHUTOFF valve (item 5,
not tighten prior to operation it may cause bodily
injury.
(g)
Set RESERVOIR SELECTOR valve
(f)
Check that dual manifold DRAIN cap
(h)
Set RETURN BYPASS SELECTOR
WARNING
c.
Startup Flush/Purge Operation.
Ensure AGPU GTE is in the stop position and
the master switch is in the off position prior to
hose connecting.
(g)
Connect one end of the appropriate
The reservoir selector must be set to AGPU
LOW PRESSURE hose to the RETURN port on the
prior to startup or damage to the AGPU pump
will occur.
Connect the other end of the LOW PRESSURE hose
(1)
Start AGPU's GTE, operating procedures,
manifold block.
(h)
Connect one end of the appropriate
(2)
Check OUTPUT PRESSURE gauge (item
HIGH PRESSURE hose to the HIGH PRESSURE port
on the AGPU hydraulic control panel (item 17, figure
to 700 psig. If no pressure is indicated verify that the
2-15). Connect the other end of
the HIGH
PRESSURE
set to AGPU and that the GAUGE SHUTOFF valve (item
b.
Flush/Purge Operation.
WARNING
When hydraulic power is turned on, the hy-
If there is still no indication of pressure immedi-
draulic hose will be under extremely high
ately shutdown the AGPU GTE and notify main-
pressure. Make sure that all quick disconnect
tenance.
fittings are secure, and hoses are not kinked.
Injury from flailing hoses could result. Wear
(3)
proper gloves and eye protection (goggles or
the ON position and ensure power on INDICATOR (item
face shield) when operating hydraulic equip-
ment.
(4)
to the INCREASE position until the OUTPUT PRES-
Hydraulic control panel setting prior to start.