TM 55-1730-229-12
TO 35C2-3-473-1
(5)
Open RETURN bleed valve (item 1, figure
tinue operation for 30 minutes.
(6)
(16)
Open HIGH PRESSURE BLEED VALVE
Close the BYPASS/FLUSH (smaller)
(7)
Observe the RETURN and HIGH PRES-
(17)
Set OUTPUT switch (item 14, figure
evidence of air bubbles in the system have disap-
2-15) to
off (down position) and observe that output
peared, close RETURN and HIGH PRESSURE bleed
light goes out.
(18)
Hold PRESSURE switch (item 11, figure
(8)
Check that SYSTEM READY indicator
2-15) to
the DECREASE position while watching the
OUTPUT PRESSURE gauge (item 9, figure 2-15). Re-
steps (1) through (13) in paragraph d. (Hydraulic Fluid
duce pressure to 500 to 700 psig.
Warm-up).
(9)
Increase PRESSURE RELIEF setting
INCREASE position until the OUTPUT PRESSURE
Failure to reduce system pressure prior to shut-
reaches 2500 psig.
ting down the hydraulic power can cause dam-
age to the pressure compensator motor on the
(10)
If PRESSURE RELIEF setting is higher
hydraulic pump and the limit switches.
than 2500 psig, unlock PRESSURE RELIEF valve lock
(19)
LIEF valve counterclockwise until the OUTPUT PRES-
SURE drops to 2500 PSIG. Lock PRESSURE RELIEF
goes out.
Set RETURN BYPASS valve (item 7, fig-
(20)
(11)
If pressure relief setting is below 2500
ure 2-15) to off position.
psig, unlock PRESSURE RELIEF valve lock knob (item
(21)
Shut down GTE in accordance with
clockwise until the OUTPUT PRESSURE increases
(IAW) paragraph 313.
to 2500 psig. If pressure stops increasing before the
required pressure is reached, repeat step (11). Lock
d.
Hydraulic Fluid Warm-up.
locking knob.
NOTE
(12)
Set OUTPUT switch (item 14, figure
This operation is performed only if required by
2-15) to ON
and observe the OUTPUT
light (item 19,
step (8) in paragraph c. Load connections to
dual manifold must be made as indicated in
valve that applies AGPU hydraulic power to the dual
paragraph a.
manifold).
(1)
Close (turn fully clockwise) the HIGH
Open the BYPASS/FLUSH (smaller)
(13)
ifold turn. Open FILL DRAIN valve (item 6, figure
NOTE
2-16) turn (larger). The
SYSTEM READY light (item
If 2,000 psig cannot be obtained in the following
out because of temperature drop caused by cold hose
step, adjust PRESSURE RELIEF valve (item 2,
fluid.
valve clockwise.
(14)
Wait until SYSTEM READY light (item
(2)
Hold PRESSURE switch (item 3, figure
2-18) to
the INCREASE position until the OUTPUT
PRESSURE gauge reading stabilizes at approximately
Continue operations for approximately 5
(15)
2,000 psig, and then release switch.
minutes. If the hydraulic module has not been operated