Table 4-2.
Organizational Troubleshooting (continued)
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION
(continued)
43.
Step 5.
Test dc contactor K2 (malfunction 94).
operational check.
b.
If contactor tests good, continue with step 6.
Step 6.
ground.
a.
If no continuity, do step 7.
b.
Step 7.
Test DC POWER switch 1S12 (malfunction 79).
a.
operational check.
b.
If switch tests good, remove battery charger access cover and
disconnect main harness connector P7 from control panel
connector J7. Check for continuity between the following
Check continuity
If no continuity,
From
To
replace wire no.
K2-X2
P38B20
P7-5L
1S12-6
P38A20
J7-5R
1S12-5
P45A20
1S2-9
Replace any defective wire, and perform operational check.
Step 8.
Disconnect main harness connector P12 from GCU connector J1 (37,
connector P13 from generator connector J1 (5, figure 4-39). Check
for continuity between the following points (see FO-5, and FO-6
4-70