d. Counterbalance Cable Removal.
1.
After shop erection is complete (AND
COUNTERBALANCE CABLES ARE SECURED), remove three
screws (1) from cable retainer block (2).
2. Let cable (3) and retainer block (2) hang loose
next to shelter (4).
3. Reinstall retainer block screws
(1) and secure.
e. Shop is now ready for reconfiguration of equipment to operational mode.
NOTE
All equipment and tools secured to floor or walls of the shelter must be carefully tightened to
SECTION II. PREPARING SHOP FOR OPERATION
2-2. ECU Shelves, lowering procedures.
NOTE
The following procedures apply only if the ECU are
to be installed.
NOTE
(For shelter PN 136-0000-101) One ECU opening is
located in the fold-out end wall and one ECU opening
is located in the fold-out side wall
(For shelter P/N 5-4-2828-1) Both ECU openings are
located in the fold-out end walls. One ECU opening
in each fold-out end wall.
a. Remove four plugs (1) on outside of each shelf (2).
Change 1 2-3