TM 55-4920-438-13&P
b. Install cable (3) and retainer block (2) with screws
(1).
NOTE
When floor is lowered, (to allow roof clearance for folding) the devices securing fold-out floor
counterbalance cables can be disengaged.
When all equipment and materiel is stored on the stationary side of the shelter, the limited floor
space presents a safety hazard to operating personnel. This is most critical during the raising
and lowering of the roof panel. Failure to observe supplemental instructions could result in
serious injury to personnel. Personnel inside the shelter could become trapped between the roof
panel and equipment bolted to the floor.
2-30 Change 1