TM 55-4920-438-13&P
SECTION III. MAINTENANCE PROCEDURES
3-6. Insert Fasteners and Bolts - Inspect
3-6
This task covers: Inspection of all insert fasteners and bolts common to the Power Train Shop
INITIAL SETUP
Tools:
Torque wrench, 0-600 inch pounds range
Personnel Required:
68D Aircraft Power Train Repairer
Reference Information:
TM 55-1500-204-25/1
INSPECTION
NOTE
Go to step 2 if bolts are serviceable.
1. Inspect bolts.
a. Remove bolt (1) that will not tighten to specific
GO TO NEXT PAGE
3-2