Installation--------------------------------
1.
Check to see that equipment is corn-
plete.
2
Preservation-------------------------------
C h e c k all surfaces for evidence of fun-
Para 4-6.
g u s . Remove rust and corrosion and
s p o t - p a i n t bare spots.
P u b l i c a t i o n s - - - - - - - - - - - - - - - - - - - - - - - - - C h e c k to see that all publications are
DA Pam 310-4.
3
c o m p l e t e , serviceable and current
C h e c k DA Pam 310-7 to determine if
DA Pam 310-7.
Modidcations---------------------------
4
new applicable MWO'S have been
published. AU URGENT MWO'S
must be applied immediately. All
NORMAL MWO'S must be scheduled.
Connections and cables--------------------- C h e c k to be sure that connectors are
5
i n t a c t , clean, and tight-fitting, and
cable is in good condition, free from
cracks or deteriorated insulation.
ACON-OFF switch--------------------------- Check that mechanical operation of AC
6
O N - O F F switch is smooth and free
f r o m internal and external binding.
Check to see that no parts or hard-
Hardware-------------------------------------
7
ware, such as bolts, nuts, and screws
a r e missing.
C h e c k to see that fan and interior of
8
Fan--------------------------------------------
power supply is clean.
the bare metal to protect it from further corro-
4-5. Touchup Painting
sion. Refer to the applicable cleaning and re-
Remove rust and corrosion from metal sur-
finishing practices specified in TB SIG 364 and
faces by lightly sanding them with fine sand-
the painting supplies available for field use in
paper. Brush two thin coats of paint (Enamel,
SB 11-573.
Semigloss, olive Drab FSN 8010-844-8088) on
4-2