TM 55-1730-229-12
AG 320A0-OMM-000
TO 35C2-3-473-1
TM 1730-12/1
d. Remove Shunt R2. (See figure
NOTE
(3) Tag and remove wires from
meter terminal screws (36 and 37, figure
7) for test.
(4) Tag and remove cables and
wires from load terminal screws (33 and
(1) Disconnect battery.
34).
(5) Remove two screws (38), wash-
ers (39), and shunt R3 (40).
(3) Tag and remove cables and Wire
from shunt load terminals (28 and 29).
g. Install Shunt R3. (See figure
(4) Remove two screws (22)
and
shunt R2 (30).
(1) Check nutplates on bulkhead
If any nutplate is missing,
(5) Tag and remove wires
panel.
from
notify maintenance supervisor.
shunt meter terminals (31 and 32).
e. Install Shunt R2. (See figure
(2) Fasten shunt R3 (40) to panel
with two washers (39) and screws (38).
If either load terminal screw (33 or 34)
(1) Check nutplates on bulkhead
is marked with a + (plus), mount shunt
panel.
If any nutplate is missing,
with plus (+) screw to left.
notify maintenance supervisor.
(3) Remove meter terminal screws
(36 and 37) from shunt. Using ID tags,
(2) Remove meter terminal screws
install (in order) on each screw, lock-
(31 and 32) from shunt (30). Using ID
washer (26), washer (27), and wire.
tags, install (in order) on each screw,
Thread screws into shunt (40) l
lockwasher (26), washer (27), and wire
or wires (with smaller wire first).
Thread screw into shunt.
(4) Remove load terminal screws
(33 and 34) from shunt. Using ID tags,
(3) Fasten shunt R2 (30) to panel
install (in order) on each screw, washer
with two screws (22).
(35), wire on screw (33) only, and
cable. Thread screws into shunt.
(4) Remove load terminal screws
(5) Replace control panel.
(28 and 29). Using ID tags, install (in
order) on each screw, lockwasher (2O),
cable or cables (with smaller cable
first), and washer (21). Thread screws
(A2).
into shunt.
(5) Replace control panel.
f. Remove Shunt R3. (See
Remove all rings, watches and other
jewelry when performing maintenance
(1) Disconnect battery.
on this equipment.