TM
55-1730-229-12
AG
320A0-OMM-000
TO
35C2-3-473-l
TM
1730-12/l
Capacity in 1000 lbs
Tiedown
Fitting No.
Fitting (A/C)
Tiedown (MB-1)
Directions
10
10
Pass the chain and grabhook across to
A-7
and through the right rear frame tie-
down point. Engage a link of the
chain in the grabhook.
10
10
Pass the chain and grabhook across to
E-7
and through the left rear frame tie-
down point. Engage a link of the
chain in the grabhook.
A-15
10
10
Pass the chain and grabhook across to
and through the right front frame
tiedown point. Engage a link of the
chain in the grabhook.
10
E-15
10
Pass the chain and grabhook across to
and through the left front frame tie-
down point. Engage a link of the
chain in the grabhook.
B-15
10
Pass the chain and grabhook through
5
the right front lift ring. Engage a
link of the chain in the grabhook.
D-15
10
5
Pass the chain and grabhook through
the left front lift ring. Engage a
link of the chain in the grabhook.
NOTE:
The following two tiedowns are required for AFT restraint if the AGPU is
not centered at station 320, as illustrated on sheet 1.
10
Pass the chain and grabhook through
5
B-3
the right rear lift ring. Engage a
link of the chain in the grabhook.
10
Pass the chain and grabhook through
5
D-3
the left rear lift ring. Engage a
link of the chain in the grabhook.
Figure 4-2.
Tiedown of AGPU for IAT (sheet 2 of 2)
4-6