TM 55-1730-229-12
(6) Remove four nuts (3) and washers (2)
(11) Install four bolts (5) that were removed in
which attach spacer (1) to gearcase pad (6), and re-
step (4). This will attach pump to spacer.
move spacer.
(7) Lubricate splines on hydraulic pump shaft
ting (10) on hydraulic pump (4) and route tube through
and internal splines on gearcase drive pad with a thin
grommet (15).
(13) Replace hydraulic access cover, and store
NOTE
DC cable in storage compartment.
If pump does not go all the way in against pad
(14)
Connect battery connector to battery.
easily, turn spline shaft on pump.
b. Removal of Hydraulic Pump Spacer. (See fig-
gearcase pad (14) studs and install four nuts (12) and
washers (13). Torque nuts to 190 inch-pounds.
(1)
Disconnect battery connector from battery.
(9) Connect drain tube (6) to fitting (10) on hy-
(2)
Open engine access door.
draulic pump (4) and route tube through grommet (15).
(3) Remove DC cable from storage compart-
(10) Install spacer (5) on storage bracket (7) us-
ing four bolts (11) removed in step (5).
(11) Replace hydraulic access cover, and store
ting (10) on pump (4), and remove tube from grommet
DC cable in storage compartment.
(15).
(12)
Connect battery connector to battery.
(5) Support hydraulic pump and remove four
bolts (5, figure 4-1) which attach pump (4) to spacer (1).
SECTION II.
MOVEMENT TO A NEW WORKSITE
(b)
Close and latch all doors.
(c)
Disconnect ground cable.
a. Preparation for Ground Movement.
(d) Ensure that fuel tank is not more than 3/4
(1)
Store all cables and hoses.
full. Drain off some fuel if required.
(2)
Close and latch all doors.
(2)
Prepare helicopter.
(3)
Disconnect ground cable.
(a)
Stow the troop seats in the folded posi-
tion.
(4) If self-propulsion mode is used, perform the
(b) Lower the helicopter ramp and position
the auxiliary ramps.
(5) If AGPU is to be towed, perform the steps in
(c)
Obtain following shoring materials:
b. Preparation for Airlift-Internal Air Transport
Two 2-inch by 12 inch by 4-foot boards.
(IAT). Prepare AGPU for IAT by CH-47 helicopter as
Two 2-inch by 12 inch by 9-foot boards.
follows:
Two 2-inch by 12 inch by 14-foot boards.
(1)
Prepare AGPU for airlift.
(a)
Store all cables and hoses.