Table 4-2.
Organizational Troubleshooting (continued)
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION
15.
(continued)
Step 11.
Test starter latch relay 3K2 (malfunction 84).
operational check.
b.
If relay tests good, continue.
Step 12.
Test starter contactor K4 (malfunction 86).
a.
operational check.
b.
If contactor tests good, do next step.
Step 13.
connector J1. Check for continuity between J1-F and J1-E (see F0-3
sheet 1).
If continuity, do step 14.
a.
b.
If no continuity, go to step 15.
Step 14.
Disconnect cables as required and check for continuity between wires
If no continuity,
From
To
replace wire no.
1S1-1
E2A18
1CB2 load
1S1-1
1S1-7
E2D18
J5-1L
1S1-6
E3B20
P5-1R
TB1-1 (ANODE)
E3C20
P8-P
TB1-1 (CATHODE)
E3D20
1CB2 load
J5-2L
E4G18
P18-B
P5-2R
L4H18
P8-B
Ground
E36C20N
P8-M
P4-A
E4H18
P4-J
K4-X1
E16A20
P14-E
K4-X2
E26A20
P5-11L
P14-F
E28A20
4-48