TM 55-1730-229-12
AG 320A0-OMM-000
TO 35C2-3-473-1
TM 1730-12/1
Table 4-2.
Organizational Troubleshooting (continued)
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION
(continued)
30.
Step 4.
If engine shuts down at 95% rpm, disconnect battery and lower control
panel. Disconnect main harness connector P4 from ECU and measure
resistance from pin S of harness connector P4 and ground (figure FO-3
wire E17A20 (P4-S to P8-A) or E17B20 (3K1-X2 to J8-A) is
shorted to ground. Replace as necessary.
b. If resistance is 200 ohms or more, replace ECU (paragraph
If engine shuts down when PNEUMATIC POWER switch is turned on, Set
Step 5.
MASTER SWITCH off and disconnect engine harness connector P5 from
A and C of load control valve.
b. If resistance is 38 ohms or more, disconnect battery and check engine harness
wires M1A20 (P2-T to P5-C) and M2820N (P2-X to P5-A). If wiring is not
Step 6.
If engine shuts down during normal operation, set MASTER SNITCH off
and disconnect engine harness connector P4 from fuel shutdown
a. If resistance is less than 20 ohms, replace fuel shutdown
b. If resistance is present check engine harness wires G7A20
(P2-J to P4-A) and G8A20N (P2-U to P4-B). If wiring is good,