TM
55-1730-229-34
AG
320A0-MME-000
TO
35C2-3-473-2
TM
1730-34/1
(2) Apply thin, uniform coating of
(3) Insert bulkhead fitting (47)
RTV-109 on top flange of reservoir.
in hole in back of module closest to the
electrical connector, long end of fit-
ting goes forward.
(3) Install a new gasket (40) on
top flange of reservoir (11).
(4) Install and tighten jam nut
(4) Coat top of gasket (40) with
(41) on long end of bulkhead fitting
RTV-109.
(47) on inside of module.
Place reservoir top cover
(5) Install copper seal (7C-8) on
(5)
(12) into module and on reservoir with
short end of bulkhead fitting (47) on
elbow fitting in top cover (12) near
outside of module.
module's left side.
(6) Install two piece reducer (45)
(6) Place two brackets (35) over
on short end of bulkhead fitting (47) on
outside of module.
second and fourth studs from forward-
left corner of reservoir top.
450 and 500 inch-pounds.
(7) Install copper seals (7C-8) on
(7) Install and tighten one nut
(36) on stud sticking through each brac-
long (inside module) end of bulkhead
fitting (47) and on upper fitting (53,
ket (35).
(8) Place terminal board panel
manifold.
(39) flange over first three studs from
(8) Insert hydraulic line (5, 56,
forward-right corner of reservoir top.
(9) Install and tighten one nut
end of tube assembly (13) near bulkhead
(36) on each of the three studs sticking
connector (47) and free end of tube as-
sembly (5) near back of main control
through panel (39) flange.
manifold fitting.
(10) Install and tighten one nut
(36) on each of the remaining eleven
(9) Install free end of tube as-
sembly (13) on bulkhead fitting (47).
studs that hold top cover (12) on reser-
Tighten hand tight.
voir (11).
(11) Install and tighten three
(10) Install free end of tube as-
bolts (37) with washers (38) through
sembly (5) on upper fitting (53, figure
8-14) on back of main control manifold.
bottom of terminal board panel (39) and
Tighten hand tight.
into frame (1). Ensure that the utility
lamp socket (81) is secured under head
(11) Torque both ends of tube as-
of bolt closest to module center.
semblies (5 and 13), which were in-
stalled in steps (9) and (10), to be-
tween 450 and 500 inch-pounds.
(12) Install a copper seal (7C-10)
reservoir.
aa. Install reservoir top cover (12,
(13) Coat threads of elbow (37)
(1) Inspect top flange of reser-
with hydraulic fluid (MIL-H-5606 or MIL-
voir (11) and threads of studs for dam-
H-83282).
8-42