Inspection/Check Procedures
Fig. 9-10
Item
Requirements
Nomenclature
Inspect/Check
No.
Visually check for cracks and
No cracks or elongated bolt
Lifting Lug
3
or lift holes allowed.
elongated bolt or lift holes.
6
Pin shall be secure. No
Mount Bracket Visually check for damage and
damage allowed.
security of pin.
No cracks or elongated bolt
Visually check bracket (6)
for cracks and elongated bolt
or mount holes allowed.
or mount holes.
Refer to paragraph c.
Visually and dimensionally
Containment
7
Ring
check containment ring.
Retainer Half Visually check for cracks
13
No cracks or deformation
of flange allowed.
and deformation of flange.
No separation or cracks at
Visually check for separation
weld allowed.
and cracks at welds.
Refer to paragraph d.
Turbine
Visually and dimensionally
21
Plenum
check turbine plenum assembly.
Assembly
Refer to paragraph e.
Turbine
20
Visually and dimensionally
Housing
check turbine housing scroll.
Scroll
Refer to paragraph f.
Turbine
Visually and dimensionally
19
Nozzle
check turbine nozzle.
9-26